Rize Wastewater Project

 

 

GENERAL INFORMATION
 

Project title
 

Rize Wastewater Project

Priority area
 

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Rize Municipality

Co-Beneficiary
 

-

Duration

Wastewater Treatment Plant 27 months

April 2021 – July 2023

 

Wastewater Collection System 24 months

March 2021 – March 2023

EU contribution (Euro)

25.380.0000

 

 

 

 

PROJECT SUMMARY

Brief description of the project and main objectives
 

Construction of wastewater treatment plant and wastewater collection system.

Improving the water quality of Black Sea via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.

Overcoming the operational problems in the sewerage system through construction of wastewater network.

Location

Rize

Achievements / expected outputs

Wastewater treatment plant and wastewater collection system.

With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.